SKE Alliance Sdn Bhd undertook the bulk of the works, which included the following:

Civil works:

  • Earthworks and piling
  • Construction of the outlet chamber and coring of existing tanks
  • Construction of the TNB switch room, 11kV switchgear room and transformer room
  • Construction of the booster pumping station

Mechanical & electrical works:

  • Supply, install, test and commission 3 vertical split casing booster pumps with the associated fittings, capable of delivering 105 MLD (million litres a day) each.
  • Supply, lay and tie-in new pipes via hot-tapping into the existing pipeworks
  • Supply, install, test and commission the electrical, instrumentation and telemetry system
  • Supply, install, test and commission an 11 ton electric overhead crane

The project was completed on time and successfully commissioned. The defects liability period has since lapsed with no major issues.