Our scope of work included the engineering, construction / procurement, testing and commissioning of the following:

Civil works:

  • Four mechanical flocculation tanks
  • Four pre-sedimentation tanks

Mechanical & electrical works:

  • Mechanical flocculators
  • Tube settlers for two pre-sedimentation tanks
  • Chemical dosing systems for potassium permanganate, alum, lime, and polyelectrolyte
  • Motive water system and water sampling system
  • Instrumentation and control system
  • Electrical supply works

The project was completed and commissioned successfully, with no major issues throughout the defects liability period.