Our scope of work included the engineering, construction / procurement, testing and commissioning of the following main items:

Civil works:

  • Earthworks and piling
  • Jetty type intake structure
  • RC channel / box culvert to convey the raw water by pump to Sungai Selangor
  • RC channel / box culvert to convey the raw water by gravity to Sungai Selangor

Mechanical works:

  • Five raw water pumps with the associated valves and piping
  • Two gravity flow control penstocks

This project is ongoing and nearing completion at the time of writing.